Project goals and objectives
Dates:
Publication Date: 6 March 2008
Appraise a range of advanced network protocols.
Evaluate the performance of computer networks to specific functional objectives.
Administration (40%)
Operating System (25%)
Loss of a file system that is used to store business critical data
Loss of a file system that is used for key applications
LAN Design (60%)
Design document including a network diagram and report.
A CD with all of your work for this assignment stored on it. Reports to be stored in Word format.
All work must be clearly labeled. You are advised to submit the work in a sealable folder (approximately A4) to ensure it all remains together.
| Quality of Solution | 0 – 30 | 30 – 40 | 40 – 50 | 50-60 | 60-80 | 80-100 |
| Operating System Management Report |
|
|
|
|
Gerrity and Hall
Replacement Campus Network
Copyright © 2008 by (Gerrity and Hall). All rights reserved. This document is supplied purely for the purpose of assisting suppliers to respond to this invitation to tender, no part of this document may be reproduced or transmitted in any form, by any means (electronic, photocopying, recording or otherwise) for any other purpose.
Form of Tenders 11
Procurement Timetable 11
SCOPE AND SCALE OF SYSTEMS 12
Scope 12
TECHNICAL REQUIREMENTS 14
GENERAL INFORMATION 14
INTRODUCTION
This ITT is to provide a complete network solution for the new campus location (plans attached) that will meet the needs of the company and will provide expansion for continued growth.
Project Goals and Objectives
The goals of this project are to implement and network infrastructure that will be: -
The infrastructure will support the business and make business processes more efficient.
Purpose of this Invitation to Tender
This ITT sets out the requirements for the new infrastructure and will be used as a specification of requirements. It forms the basis for the bidding process. All proposals for the new system must be based on the information contained within this document.
Form of Tenders
Procurement Timetable
BACKGROUND
Institution's Background
Key dates:
Installation of infrastructure into campus buildings July 2008
Technical Environment
Current Business Systems
Administration and Personnel systems (based in building 3, 50 staff)
Financial services (based in building 3, 40 staff)
SCOPE AND SCALE OF SYSTEMS
Scope
Scale
Number of users: - 970 across 5 departments and 3 buildings
The division of users between the buildings in provided above.
KEY REQUIREMENTS
Flexibility of design
Security
GENERAL REQUIREMENTS
An established strategic partnership with the supplier which will include: -
Support services, telephone support, on-site support as required.
DETAILED FUNCTIONAL REQUIREMENTS
A wired IP based converged network
IPv6 or IPv4 across the network, you should provide a brief description of the pros and cons of each and make a recommendation on which you will employ.
A secure wireless segment in the ground floor meeting rooms of building 1
Provide VOIP to all desktops
High availability and high performance of both the LAN and the external connection
During the hours of 8am until 6pm on Monday to Friday
Administration
Marketing
TECHNICAL REQUIREMENTS
Routers to be used in the backbone.
Identify and justify the routing protocol to be used on the LAN
Ethernet will be the underlying protocol
Staffing
GENERAL INFORMATION
Bankers details, name and address
Name of holding company (if any)
IMPLEMENTATION REQUIREMENTS
You will have a project office assigned on site, and storage space will be available for the installation.
Access to the buildings will be negotiated for each member of the suppliers staff, all staff will be processed through our existing security mechanisms.
