After zoning approves tenants business license application

You can review the center's Tenant Handbook and Construction Rules, Tenant Sign Criteria and Storefront Criteria by logging onto www.SIMON.com.

IMPORTANT TELEPHONE NUMBERS

Las Vegas South Premium Outlets

FEDERAL EXPRESS (800) 238-5355

FIRE & RESCUE (NON-EMERGENCY) HEALTH DISTRICT, CLARK COUNTY
HOSPITAL – SUNRISE MEDICAL CENTER

Visit the Clark County’s website at:

(For Building Department, accessclarkcountyservices)

by Landlord prior to commencing work. Please allow 5-10 working days for Landlord review.

2. Please note that Tenant is required to provide Landlord with one (1) electronic set of as-built tenant improvement drawings (including any plan check corrections or engineered plans) upon completion of the store construction.

Due to structural engineering design of the roof system, Tenants and/or their contractors cannot attach to or construct anything on the bottom of the roof structure unless approved by Landlord.

The address for Las Vegas South Premium Outlets is as follows:

Temporary Tenants that will be in possession of their suite for less than a year are not required to change utilities over to their name, this includes gas and electric only.

11. Protection for the HVAC unit(s) (construction filter) must be in place prior to the start of Tenant’s construction. The HVAC unit must also be cleaned when tenant construction is complete. This is the responsibility of Tenant, NOT the Landlord. If painting ceiling, HVAC unit must be off – not running.

12.

Relocation of thermostat controls shall be at the Tenant’s expense and any repairs or failed installations resulting from incomplete or inadequate relocation shall be the Tenant’s

contractor will need to submit three (3) complete sets of tenant improvement plans. You will need to allow at least four to eight (4-8) weeks for the plan check and permit issuance of your tenant improvement plans.

15.

Lastly, the Fire Department will schedule their inspection only after the above two approvals. Note Fire Department may take a long time due to changes in local code and inspection requirements. Ask if you can pay for an expedited inspection by the Fire Department: (702) 226 - 8991 or (702) 455 - 7311.




included on your drawings:
Provide flame rating certificates for all hanging fabrics (excluding merchandise intended for sale)
Provide flame spread ratings for all wall covering and ceiling materials to demonstrate conformance with Chapter 8 of the 2006 IBC
If your only wall covering is painting the gypsum board, make a note clearly stating this Review the Clark County Amendments to the 2006 IBC Chapter 26 which regulates the size of plastic signs and types of plastics that can be used on walls and ceilings

review status. There is a very informative Building Permit Guide that can be found on their website. Follow the steps below to access this guide:

22.

Food Tenant Design Requirements

Below is the minumum design requirements that must be used by ALL Food and Food Court Tenants for all kitchen prep area’s.

4. Metal or PVC corner guard must be applied to all corners and caulked with a silicone sealant.

Flooring area:
1. Floor tile and flooring base installed must be sealed. This application should be re-applied semi-annually.

Specific to LVPO South ONLY!!!

Barricades must be erected if there is any construction that goes beyond or on the

Barricade Construction Notes:

1. All supporting must be concealed behind the barricade

Tenants intending to make modifications to their façade must conform to the Storefront Design Criteria for Las Vegas Outlet Center-South.

Specific modifications will be approved by Tenant Manager at the time of Tenant plan review.

Neutral piers must remain as-is. In the event the neutral pier needs to be repainted, only the Sherwin Williams neutral pier paint specification as detailed on the following page can be used.

Tenant must remove existing base tile at its storefront façade and replace with one of the base material options offered in Storefront Design Criteria (except at the Neutral piers where the existing

Design

A minimum 8” x 11” drawing of the Temporary sign must be presented to the tenant manager at least 2 weeks before installation. Sample color chips of any planned colors must be attached. Once approved, Tenant may proceed with installation. Upon no circumstances can the temporary sign be installed without prior approval.

Size
The size of the sign will be at the discretion of the tenant manager. The size is based on the elevation of the building and neighboring signs.

The sign cannot exceed the size restrictions of permanent signs per sign criteria.

Materials
Individual l/2” thick cut out letters from Foam Plex, Ultraboard, mounted to a 1/4” sintra background panel via double sided tape with silicone. Maximum size of the background panel is 2’ high by l0’wide.

Installation
Minimum 1/4” sintra panel screwed to fascia. Screw head to be covered with background panel color. Sign installer must use the minimum amount of screws to securely fasten the sign to the building. Maximum number of holes is 8.