Download as:
Rating : ⭐⭐⭐⭐⭐
Price: $10.99
Language:EN

Construction budgetbudgetborterialsfixed costbudgettaskvendor subcontractor ractorhrsrate requirementsabc constructors group construction planningplace frameworkduration estimateresources requirementsconcretesite prepabc constructors group demo prepsite clearingsite surveyingsite investigationon-site water constructors group inspect equipmentsadd chemicalscleaning water pipesadd filtersutilitiesabc constructors group electricityenergy managementdesign machineswater and sewage servicesexcavation earthworkabc constructors group trenchingdiggingdredgingsite developmentfoundationabc constructors group shallow fondationdeep foundationstrip foundationtrench fill foundationother masonry constructors group cementing paved areacut paving stonesdesign paver patternrough framingabc constructors group measurementassemble lumber for wallsadding anchorsexteriorabc constructors group exterior stoneexterior case workexterior paintingexterior wall coveringwindows doorsabc constructors group measuring spaceattaching studsadding doors and windowsplumbing constructors group map layout for pipesdrainage systeminstalling pipesinstalling support for pipesassembles fittingsdrywall constructors group apply drywallfasten drywall panelsprepare panelsinterior finishabc constructors group interior doorsinterior paintingrailingtilingkitchen bathabc constructors group pantry areasink areashower stallsbathtub surroundsporches decksabc constructors group shedspaintpvcappliancesabc constructors group lightsfansheating equipmentstotal maxium budget maxium fixed costfoundation foundationactualunder under

119 $ 40.00 18 $ 2,074.00 $ 42,092 $ 40,000.00
44 6 $ 200.00
53 5 $ 764.00

Dredging

21 4 $ 765.00

Site development

1 3 $ 345.00
119 $ 40.00 133 $ 1,209.00 $ 165,557 $ 150,000.00
24 43 $ 435.00
64 20 $ 231.00

Strip foundation

23 30 $ 231.00

Trench fill foundation

8 40 $ 312.00
14 $ 40.00 18 $ 964.00 $ 17,912 $ 20,000.00
6 7 $ 65.00
5 6 $ 876.00

Design paver pattern

3 5 $ 23.00

ROUGH FRAMING

39 $ 40.00 12 $ 818.00 $ 11,376 $ 15,000.00
12 4 $ 675.00
23 4 $ 78.00
4 4 $ 65.00

EXTERIOR

ABC Constructors (Group 3)

30 $ 30.00 14 $ 1,407.00 $ 20,598 $ 20,000.00
21 2 $ 764.00
2 3 $ 564.00
3 4 $ 45.00
4 5 $ 34.00

WINDOWS/EXTERIOR DOORS

ABC Constructors (Group 3)

5 $ 30.00 18 $ 972.00 $ 17,646 $ 22,000.00
2 6 $ 876.00
1 6 $ 53.00
2 6 $ 43.00

ABC Constructors (Group 4)

63 $ 22.50 30 $ 2,957.00 $ 90,128 $ 100,000.00

Map layout for pipes

23 6 $ 657.00
3 6 $ 978.00

FOUNDATION
FOUNDATION

$ 45,410 $ 4,590.00
$ 129,472 $ 5,528.50
$ 61,934 $ 8,066.00
$ 99,980 $ 20.50
$ 27,356 $ 2,644.00
$ 44,799 $ 201.50
$ 43,002 $ 998.00
$ 30,120 $ (120.00)
$ 16,137 $ 863.00
$ 863,517 $ 24,483