Procurement risk and contract management

Assessment Information/Brief 2020/21

Assessment Criteria

Marking Scheme

 Criteria Marks
Identification of risks 20
Assessment of risks 20
Mapping of risks 20
Action Planning 30
Citation and References 10
    • Integrates the complexity of a range of knowledge and excellent understanding of its relevance.

    • Excellent depth of knowledge in a variety of contexts. Coherent and systematic application of theory to practice

  • Fair – 50-59

    • Mostly accurate knowledge with satisfactory depth and breadth of knowledge. Sound integration of theory and practice with satisfactory identification of key themes. Fair demonstration of depth and breadth of knowledge.

    • Inadequate identification of key themes.

  • Poor – 20-29

    • Totally inadequate demonstration of required knowledge. Not able to link theory to practice. No appropriate themes identified.

You should consult Level 7 Generic Grade Descriptors for detailed grade/mark descriptors.

Reassessment

If you fail your assessment, and are eligible for reassessment, you will need to resubmit in a date that will be notified to you. For students with accepted personal mitigating circumstances, this will be your replacement assessment attempt. Students should be aware that there is no late submission period at reassessment (this includes those students who have an accepted PMC request from a previous attempt). If a student needs to be reassessed, s/he will be given a new assignment brief with a deadline, which will be provided by the School.

Yang Sing Hotel

You have recently been appointed by an investment company who wish to relaunch the Yang Sing Hotel (see Case Study Introduction below) under a new name after recently buying the building but they have concerns over the problems that caused the Yang Sing Hotel to close.

Yang Sing hotel Manchester

This building is a Grade II listed “Manchester” warehouse, with cast iron internal columns, timber beams and masonry external walls. The building had been left vacant for a number of years and extensive repair works were required to prevent further deterioration (to remove dry and wet rot, leaking roof, leaning parapet brickwork etc.), before plans to convert into hotel were developed.

Structural conversion works included removing the original central staircase and lift; constructing a new lift and stair-core, repair and strengthening works to timber floor beams; adaption and strengthening works to roof trusses to allow formation of mezzanine floor to top floor suites; formation of new plant room at roof level; repair of cast iron column, and enhancing stability of external masonry walls. The considerable work required meant that rebuilding and redesign work went over budget and over time.

Yang Sing Closes

The nationally renowned Yang Sing Restaurant, located next door and run jointly by Mr Yeung and his brother Harry for more than 30 years, is unaffected by the hotel’s closure.

The Yang Sing Oriental offered 48 individually designed bedrooms and suites inspired by the cultures of the Far East, with rack rate tariffs ranging from £179 - £569 per night.

A newspaper travel writer said: “Manchester is a world class destination and has the accommodation to match. It [Yang Sing Oriental] is incredibly stylish, luxurious and laid back...”

Guest feedback on the Late Rooms website showed that 98 per cent of visitors would recommend the hotel and would return.