Download as:
Rating : ⭐⭐⭐⭐⭐
Price: $10.99
Language:EN
Pages: 1
Words: 362

Substrate (floor to be screeded to fall)

planter box

torch Applied sheet membrane

Product specification

Substrate preperation

priming

Substrate (floor to be screeded to fall)

  • Over the prepared substrate apply one coat of Elastocol 500 primer at a rate of approximately 4-5m2 per litre to the entire area to be waterproofed.

Detailing and reinforcement

  • Install cementitious fillets to all perimeter junctions both vertical and horizontal as well as internal corners.

Waterproof membrane

  • Flood test the area waterproofed prior to proceeding with the installation of the drainage components and soils.

  • Ensure the finished waterproof membrane is protected prior to the installation of the drainage components and soils.

CONTACT DETAILS

Allduro

IMPORTANT NOTEs

Allduro recommends referral to all pertinent product data sheets listed in the above specification prior to commencing application. The information contained herein is given in good faith as being true and accurate, but no liability is accepted by Allduro, our employees, distributors, representatives or agents, for any loss or damage, direct or indirect, that may result from using the information or adopting recommendations and/or suggestions as actual conditions for use are beyond our control

Copyright © 2009-2023 UrgentHomework.com, All right reserved.