Download as:
Rating : ⭐⭐⭐⭐⭐
Price: $10.99
Language:EN
Pages: 26
Words: 7698

With the hope improve the performance the company

  • You may attach a separate sheet if required.

  • You must include the following particulars in the footer section of each page of the attached sheets:

    • Page numbers

  • You must staple the loose sheets together along with the cover page.

  • Please follow the format as indicated in the template section below.

  • One of the most important steps that you can take: proofread your project.

  • Computer

  • Internet

Assessment task Instructions:

  • This assessment task requires you to assume/ take on the role of an IT manager.

  • Word limit to complete the report (Activity 1) is 600-800 words.

  • Time limit to complete the Activity 2 (Meeting) is 10-20 minutes.

There are currently 450 students that attend the institute across a wide range of classrooms.

Network diagram of the RTO to give illustration of all the all the computers, printers, scanners, servers, Wi-Fi access points, switches, routers

  • 150 computers

  • Wi-Fi

  • 15 hubs

  • Networking cables

Assessment task description:

  • This is the second assessment task you have to successfully complete to be deemed competent in this unit of competency.

Applicable conditions:

  • You must read and respond to all criteria of the project.

  • The trainer/assessor may ask you relevant questions on this assessment task to ensure that this is your own work.

General Instructions for attempting the project:

  • You will be required to correctly attempt all activities of this assessment task.

Purpose of the assessment task:

  • Skills to report on installation and integration of virtualisation.

  • Skills to handle the meeting professionally.

  • You may attach a separate sheet if required.

  • You must include the following particulars in the footer section of each page of the attached sheets:

    • Page numbers

  • You must staple the loose sheets together along with the cover page.

  • Please follow the format as indicated in the template section below.

  • One of the most important steps that you can take: proofread your project.

  • Internet

  • MS Word

  • Virtualisation software

  • Operating system

  • You are required to complete the following activities in this assessment task:

    • Activity 1: Install virtual server

  • Time limit to complete activity 1 is 3-4 hours.

  • Word limit to complete activity 2 is 300-400 words.

Activity 1: Install virtual server

  • Operating system

  • Testing tools

  • Install virtual machine software on server

  • Install operating system on virtual server

Q1: Explain each of the following terms in the context of implementing server virtualisation for a sustainable ICT system:

  1. Client Business Domain

  1. Datastores

Error “ESX/ESXi 4.0 does not support LUNs larger than 2TB in size”

Target Datastore

3. Select the appropriate LUN from the options and then click "Next." To create a new extent, select a LUN marked as un-expandable (listed as "No" under the "Expandable" category); to increase the size of an extent, select a LUN marked as expandable. Select the appropriate disk layout and then click "Next."

Error “Incompatible device backing specified for device”

Resolution:

If the above steps fail to resolve the error, check the VMX file associated with the virtual machine to see if the optical device is connected in the configuration data. If the file indicates that the optical device is connected, remove and then re-add the CD- or DVD-ROM from the same window.

VMX File

Q4: How can you identify current industry-accepted products? List ten (10) methods.

  1. Keep up with consumer magazines

  2. Scan and engage in forums and discussion boards

  3. Observe your competitors

  4. Observe your competitors

Q6: Explain the linkage between processes and how it is utilised. (50-100 Words)

The linkage between processes is basically the way toward looking at the connections between wanted business results and Internet Communication Technology designs. The examination of linkage is utilized to as a rundown to check against to guarantee that all pertinent, wanted business results are tended to by a mechanical part that empowers the result to be proficient. The linkage procedure starts with figuring out what business results are wanted that will influence server virtualization. The coveted results ought to be utilized to decide the design that will best help with achieving the business objectives. After the server has been set up, the rundown of wanted results ought to be counselled again to guarantee that every single pertinent result have been tended to in server design.

Q7: What are the ten (10) system diagnostic features of “Windows Server 2012 R2” operating system?

  1. Power supply requirements and management

  2. Registered random access memory (RAM)

  3. Virtual server functionality

The purpose of this feasibility study is to provide recommendations to management to make decisions related to investment virtualization technology on one of the regional development banks in many organisation as an alternative solution to replace the infrastructure that currently exists and is obsolete, with the hope to improve the performance of the company. Method of data collection is through survey, interviews and viewing documentation. Analysis method is using the Fit/Gap Analysis and discounted cash flow to compute net present value. The results of this study indicate only 22.2% of the current system has fit, 55.6% of the current system has partial fit, and 22.2% of the current system has gap, and has positive value of net present value. The conclusion was that companies need to invest in virtualization technologies, by replacing obsolete systems in order to address the gaps and partial so as to improve efficiency and effectiveness

Q10: How existing server infrastructure use can be analysed in a network? Explain the three (3) steps. in 250-300 words.

Example Answer:

To use risk assessments to research and analyse alternative virtualization scenarios following point are given identify virtualized assets and categorize data storage associated with virtualization. With virtual environments, unfortunately, this can be a very difficult step. Leverage management tools like VMware vCenter and Microsoft’s System Center Virtual Machine Manager (SCVMM) to identify virtual machines, VM storage and hypervisor platforms, and use native storage management tools from vendors like EMC Corp. and NetApp Inc. to keep track of where disk files are located. These disk files should be located on SAN or NAS partitions appropriate to the sensitivity of the data they contain, as with any data classification effort.

Q13: What information should be included in a brief report to the appropriate person or supervisor?

Identify your purpose before you start writing your memo or report. It will save you lots of time rewriting later on and prevent a sense of aimlessness from creeping into your content.Use the strategies of investigative writing to get the ball rolling. Answer the questions: Who, What, Where, When, Why, and How. Are you addressing a quality assurance team about a change in a project deadline or coworkers about an office party announcement? Why is the subject of your memo or report important? If you're addressing an issue, how do you intend to solve it? What is your call to action - how do you want readers to respond? Once you've nailed down some solid responses, you're ready to fill in the blanks.

Proceed in an orderly manner

Q14: Who should you liaise to obtain approval for plans, along with any recommendations, in a typical ICT workplace?

  • Key considerations to determine network operating system, server applications and server design

Example Answer:

3- Type the following command

winver

2- Open a Microsoft MS-DOS command prompt shell window "cmd"

3- Type the following command

  1. Run LDP.exe, go to Connection and then click on Bind.

  2. Click Ok. Next click on View, Tree and then select the following LDAP path from the dropdown list: CN=Schema,CN=Configuration,DC=<DomainName>,DC=<Com>

Q17: Outline the four (4) main types of resources required for an organisation within its budget and other constraints? Write your response in 250-300 words.

Answer may vary but student must include the following information:

Normally a project team is a group of people and you won’t be working alone. The team management part is often the hardest part of the project, especially if you haven’t had to lead a team in the past. Managing their time and workload can be tricky too, as most of your project team members won’t work solely on your project. They will have day jobs and may be involved in other projects at the same time.

Capital

  • Software licenses

  • Hardware like technical infrastructure such as cabling or switches for the IT equipment

Q19: What are the four (4) types of environmental requirements that you should consider while installing virtual servers, in accordance with the plan and manufacturers’ specifications? (50-100 Words).

  • If you are going to use UFT 12.01 it doesn’t work with Windows XP. So you should install higher version of Windows to work with UFT. Check OS compatibility of your required application before proceeding with operating system installation.

  • Is your Processor supports Virtualization? Almost all of the new processors support virtualization but it is a good idea to check manufacturer’s website to know the details. E.g. Intel Pentium Dual Core T2390 processor doesn’t support virtualization for a 64-bit operating system. So, in that case, you should install 32-bit operating system compulsory.

Answer may vary but student must include the following information:

  • Four (4) reasons for you to notify the client for site access

Tasks must be significant enough to be included in the plan. Insignificant or unscheduled related tasks only clutter your project task list. For example, in the ‘pour the concrete’ task, mixing the concrete may be important, but it may not be significant enough to include as a separate step if it doesn’t affect how the task is scheduled

When you list your tasks and milestones, you must be aware of the scope of the tasks and the assumptions on which the tasks and milestones are based. This helps you to identify changes and measure progress.

Q23: Explain the process you may use to install required operating system, additional tools or third-party software as specified in design. Write your answer 50-100 words.

Answer may vary but student must include the following information:

outsider programming that will be introduced with the required working framework can be gotten on the physical gadgets as

  • Linux

Answer may vary but student must include the following information:

  • Two (2) tests to determine and conduct to make sure the virtual server integration is successful

hardware just to run your QA tests. Applications running on a virtual machine behave as if they were running on their own physical system. This is very useful for testing applications and allows testers to test their application under various platforms using a single computer. It can also be helpful for testing web applications since you can simultaneously test your web application in multiple browsers running independently from each other under different virtual machines, again, without the cost of purchasing more hardware for your testing needs

VIRTUAL TESTING LABS ON A SINGLE COMPUTER

Example Answer:

Using Visual Studio, you can run your tests and also collect data and diagnostics when you run your tests. You use test settings to specify the data and diagnostics to collect. You can even select diagnostic data adapters that affect the way that your test machine performs. For example, you might want to create a video recording of your desktop while you run your test or collect system information about your Web server. Or you might want to emulate a slow network to impose a bottleneck on the system. To run tests remotely on multiple machines or collect data and diagnostics remotely you must use a test controller and test agents. The test controller runs as a service and assigns tests to a test agent to run. In addition, it can tell the test agent what data or diagnostics need to be collected. You can manage the test controller and agents by using Visual Studio, or if you register the test controller with Team Foundation Server, then you can manage the controller and agents by using Microsoft Test Manager.

Q28: What are the four (4) types of changes or additions that may be required in response to the error report analysis?

Example Answer:

Once any progressions or increases have been tried and are affirmed as being operational and exact it will be important to guarantee that the progressions or augmentations are then approved against the details that have been accommodated the specific server arrangement. The progressions or increments against particulars can be approved based on following data and segments

Q30: How can you document installation and integration process according to organisational guidelines? Answer in your own 50-100 words.

Answer may vary but student must include the following information:

  • Five (5) types of user documentation that should be provided to a user

  • List of server names and roles and all IP address

  • A change log for each of the servers

Copyright © 2009-2023 UrgentHomework.com, All right reserved.