Question:

The task:

1) Develop your own week-by-week programme for construction of the Railway bridge from the first part of the 2018-19 project, assigning realistic durations for each activity. (10%)

2) Write an explanation (1-2 pages) in support of your programme outlining the detailed operations required, equipment needed, likely numbers of personnel. This should explain why the durations on the programme are sensible. (15%)

3) Sketch and label an outline design for the formwork and falsework needed in order to concrete the cross beam on the central pier of Shelford Road bridge. Include notes of materials used. (10%)

4) Write a description (1-2 pages) of the risks of work on a linear construction site such as a road and the precautions that need to be taken to maintain safety. Include basic personal protection as well as site operation. (15%)

5) Write a short discussion (1-2 pages) on the relative merits of different types of bridge construction for:

a) A single-span 25m highway bridge over, for example, a railway.

b) A single-span 100m highway bridge over a valley + river.

c) A multi-span 500m highway bridge at an elevation of up to 30m above the ground You can present your discussion either in 3 parts or combined. (20%)

6) Carry out a design for one section of a multi-span cable-stayed bridge carrying a 4-lane highway, as in the figure below. Specifically you should:

a) Suggest a sensible deck cross-section, with approximate dimensions + a few sentences giving your reasons;

b) Estimate the total weight of the deck + traffic using the road;

c) Propose an arrangement of cables (can be more or less than those shown);

d) Calculate the force in each cable and propose cable thicknesses;

e) Calculate the compressive force in each part of the deck;

f) Considering the overall weight, propose sensible materials and thicknesses for the tower.




Buy Cive1004 Civil Engineering Assessment Answers Online


Talk to our expert to get the help with Cive1004 Civil Engineering Assessment Answers to complete your assessment on time and boost your grades now

The main aim/motive of the management assignment help services is to get connect with a greater number of students, and effectively help, and support them in getting completing their assignments the students also get find this a wonderful opportunity where they could effectively learn more about their topics, as the experts also have the best team members with them in which all the members effectively support each other to get complete their diploma assignments. They complete the assessments of the students in an appropriate manner and deliver them back to the students before the due date of the assignment so that the students could timely submit this, and can score higher marks. The experts of the assignment help services at urgenthomework.com are so much skilled, capable, talented, and experienced in their field of programming homework help writing assignments, so, for this, they can effectively write the best economics assignment help services.

Get Online Support for Cive1004 Civil Engineering Assessment Answer Assignment Help Online

Resources

    • 24 x 7 Availability.
    • Trained and Certified Experts.
    • Deadline Guaranteed.
    • Plagiarism Free.
    • Privacy Guaranteed.
    • Free download.
    • Online help for all project.
    • Homework Help Services
); }
Copyright © 2009-2023 UrgentHomework.com, All right reserved.