Urgenthomework logo
UrgentHomeWork
Live chat

Loading..

BNV5074 | Engineering | The Building Creative Design Concept

The Brief / scenario:

The client is considering acquiring a site at Warwick Bar and has recently sponsored an architectural ideas competition to assess the potential of the site. Having selected a design concept, the client is now inviting contractors to progress the idea on a design and build basis.

As construction managers you are commissioned  to evaluate and crtically assess  the environmental context of the site and its potential impact on the design concept . You are requested by the client  to consider the practical application of the principles of architectural engineering and environmental technology on the design concept. You need to research and identify the most suitable environmental  technologies which can be full incorporated including the newly emerging Renewable Energy Technologies (e.g. photo voltaic, wind tribune, geothermal) and  prepare a report to the client spelling out the rational and justification for your decision and the likely cost estimation incurred for implementing and incorporating these technologies.

This project will be based around a property at Warwick Bar, Fazeley Street, Birmingham; a site visit for CM students will arranged. All the information you require will be provided either in the course documentation on Moodle (coursework resource directory) or by observation during the site visit.

  1. How through synergic design approaches both creative design and engineering methodologies are incorporated into environmentally sustainable technologies for a building.
  2. How through the consideration of environmental context, the principles of thermal comfort and building behaviour that a strategy for passive and /or active control measures, ventilation, air conditioning, heating / cooling systems, solar control, lighting design and energy management are incorporated into a building.
  3. How through consideration of the principles sound and acoustic appropriate strategies of noise control, echoing and acoustic design are incorporated into a building.
  4. How fire strategies and escape, vertical movement (lifts) and distributive / waste services are incorporated within a building with consideration of appropriate maintenance and reference to relevant regulation.

Buy BNV5074 | Engineering | The Building Creative Design Concept Answers Online

Talk to our expert to get the help with BNV5074 | Engineering | The Building Creative Design Concept Answers to complete your assessment on time and boost your grades now

The main aim/motive of the management assignment help services is to get connect with a greater number of students, and effectively help, and support them in getting completing their assignments the students also get find this a wonderful opportunity where they could effectively learn more about their topics, as the experts also have the best team members with them in which all the members effectively support each other to get complete their diploma assignments. They complete the assessments of the students in an appropriate manner and deliver them back to the students before the due date of the assignment so that the students could timely submit this, and can score higher marks. The experts of the assignment help services at urgenthomework.com are so much skilled, capable, talented, and experienced in their field of programming homework help writing assignments, so, for this, they can effectively write the best economics assignment help services.

Get Online Support for BNV5074 | Engineering | The Building Creative Design Concept Assignment Help Online

); } export default Bnv5074;
Copyright © 2009-2023 UrgentHomework.com, All right reserved.